The original plan was to pour the concrete piers for the house, build the carport and shop and then move the shop and house containers over to the property in a nice orderly manner. The shop landlord is selling the property so we have until March 15 to be out. So we opted for full chaos moving as a new plan. We moved the first of 8 containers onto the property only to realize we had blocked the access to the power pole that APS will need to set us up with a temporary construction power meter. So we got George the crane guy to lift, rotate and move the container 15 feet.