It’s been awhile since the last update. Hidden in the Hills Studio Tour in November was the best ever. We had over 1,000 people visit. In March Dief had his prostate (cancer) removed so he is just now able to return to working on the house.
The bedroom pop-out is now enclosed.
This is looking down through the perforated steel decking out side the bedroom. This will lead down to a platform for the hot tub. The stairs, bridge and catwalks in the house will be of the same material.
Gandalf closing up the gap between the bedroom ceiling and the shade rood above it.