Spent yesterday schlepping 7,500 pounds of floor tile from where the 5 pallets got dropped off to the “office” container – a distance of about 150 feet. Three boxes at a time using my heavy duty hand cart. They were in the way of where the electrical trench will be dug. We have spent a fair amount of time moving stuff (usually heavy stuff) from one spot to another. The challenges of a small building site.
caryl parker says:
good work!