Schlepping

Spent yesterday schlepping 7,500 pounds of floor tile from where the 5 pallets got dropped off to the “office” container – a distance of about 150 feet.   Three boxes at a time using my heavy duty hand cart.  They were in the way of where the electrical trench will be dug.  We have spent a fair amount of time moving stuff (usually heavy stuff) from one spot to another.  The challenges of a small building site.

One thought on “Schlepping”

  1. caryl parker says:

    good work!

Leave a Reply

Your email address will not be published. Required fields are marked *